1. When the winter water temperature is low and affects the coagulation effect, in addition to measures such as increasing the dosage of chemicals, methods such as increasing the reflux water volume or increasing the dissolved air pressure can also be used to increase the number of microbubbles and their adhesion to the flocs, in order to compensate for the decrease in the floating performance of aerated flocs due to the increase in water viscosity and ensure the quality of the effluent.
2. In order to not affect the water quality of the effluent, the dissolved air flotation machine needs to raise the water level in the pool during slag scraping. Therefore, it is necessary to accumulate operating experience, summarize the appropriate thickness and water content of the slag accumulation, regularly run the slag scraping machine to remove the slag, and establish a slag scraping system that is in line with the actual situation.
3. During inspection, observe the water level inside the gas tank through the observation hole to ensure that the water level does not submerge the filling layer and affect the gas dissolution effect; Not less than 0.6m to prevent a large amount of undissolved air from entering the water.
4. During the inspection, attention should be paid to observing the condition of the pool surface. If the surface of the contact area scum is found to be uneven and the local water flow is turbulent, it may be due to individual release devices being blocked or falling off, and timely maintenance and replacement are needed; If it is found that the surface of the separation zone scum is uneven and there are often large bubbles bulging out of the pool surface, it indicates that the bubbles do not adhere well to the impurity flocs, and it is necessary to adjust the dosage or change the type of coagulant.
5. Adjust the dosage of coagulant in a timely manner based on changes in the flocculation of the reaction tank, the scum in the separation zone of the air flotation tank, and the water quality of the effluent. At the same time, regularly check the operation of the dosing pipe to prevent blockage (especially in winter).
6. Before debugging the air flotation method and entering the water, the pipeline and the dissolved gas tank should be repeatedly purged and cleaned with compressed air or high-pressure water until there are no easily clogged particles or impurities before installing the dissolved gas release device. A one-way valve should be installed on the intake pipe to prevent pressure water from flowing back into the air compressor.
Jun 28, 2023
Precautions for daily operation of dissolved air flotation machine